September 24, 2003
Brickyard

Today's big event was the widening of the door between the kitchen and back room.


This involved cutting a brick's width of wall away, and there's a new layer of coarse red dust in the construction zone. It also looks like the saw threw the circuit breaker a few times.



Steve is trying to convince me to replace the shower pan in the master bath, which leaks a few drops of water over the course of a shower. He thinks it will only get worse as time goes on. I'd really hate to go through bathroom trauma on top of the rest of this. After the hurricane we discovered that the drain outside the laundry room doesn't go anywhere, so we're looking into a sump pump for that corner of the basement - another big chunk of change there.

Posted by chuqd at September 24, 2003 11:12 PM
Comments
Post a comment
Name:


Email Address:


URL:


Comments:


Remember info?